Schedule a call
MCL Construction-Construction Manager/General Contractor
  • Home
  • How We Build
    • About MCL Construction
    • MCL Safety
    • Preconstruction Approach
    • Virtual Design & Construction
  • What We Build
    • Healthcare
    • Corporate Office
    • Education >
      • K-12
      • Higher Education
    • Religious & Non-Profit
    • Athletics and Aquatics
    • Lifestyle and Retail
    • Logistics & Warehouse
  • Careers
  • Locations
    • Omaha
    • Kearney
  • Home
  • How We Build
    • About MCL Construction
    • MCL Safety
    • Preconstruction Approach
    • Virtual Design & Construction
  • What We Build
    • Healthcare
    • Corporate Office
    • Education >
      • K-12
      • Higher Education
    • Religious & Non-Profit
    • Athletics and Aquatics
    • Lifestyle and Retail
    • Logistics & Warehouse
  • Careers
  • Locations
    • Omaha
    • Kearney
Schedule a call

10/28/2020

0 Comments

Advanced Technology Improves Virtual Connection

 
Written by: Ben VanderWert, PHR, SHRM-CP
Picture
Connecting at Virtual College Career Fairs
This year has brought a lot of changes in the way we operate as a community.  School days are spent at home for some, most work is virtual, and gatherings with your family and friends are distant.  It’s been hard.  What we need to keep doing is remind ourselves that we are not alone.
We are in this together and together we are learning to be flexible and adjust to what comes next. 

As MCL’s Talent Acquisition Manager, meeting and interacting with people is a huge part of my job and most of our talent is discovered by meeting college students at their campus career fairs.  Much like schools going to virtual learning, career fairs have changed to virtual as well. 

​This year, MCL Construction participated in nine virtual career fairs.  I have done virtual fairs in the past and they can be challenging. It takes out the in-person interaction and, really, the opportunity to read body language.  However, I would never pass up the opportunity to meet with students passionate about his or her next career move.  So, I took a little bit of my own advice that I mentioned earlier and tried to be flexible and adjust to what comes next.
Picture
MCL Smart Lab
MCL Construction opened its new headquarters in June 2020.  More than an office space, the building incorporated state-of-the-art technology in nearly every meeting room.  The office is equipped with smart labs with interactive screens, video conferencing in collaborative meeting spaces, and conference rooms with wide-lens cameras to virtually bring an entire group to any meeting.  Having these resources made adjusting easier and allowed us to connect during a time where we feel disconnected from others. 

During each virtual fair, students would sign up for time slots before the fair.  Each student was slotted for about 10 minutes of conversation in MCL’s virtual booth.  At a traditional career fair, 10 minutes is typically enough time when there are a lot of employers and students jammed into some sort of hall or gymnasium.  Since these conversations were just one on one, they felt like a more formal interview than a quick conversation. I found that 10 minutes was not even close to being long enough with most students interested in a career with MCL Construction.  But again, we had to adjust.  We were able to set up a lot of students with second video conversations and have hired several of them for our summer internship program.  We also set up group presentations virtually using our training room’s wide camera. 

Going back to that crowded gym with a bunch of employers and students, it can be hard to gauge who is genuinely interested in your company or who just stopped by casually.  In a virtual setting, students sought you out ahead of time and prepared to spend time one on one with members of our team.  It was clear that students who signed up for our booth were seriously interested in their future in construction management. 

​There has certainly been a theme with everything going on. In order to be successful in what you are trying to accomplish these days, you need to be agile and adjust where you can.  Also, remind yourself you can control what you can and adjust to what you can’t.  Thank you to everyone who made that adjustment with us and attended our virtual career fairs.  We look forward to seeing some of you over the summer.
About MCL Construction
​For many businesses, navigating the entire construction process and knowing who to trust can be overwhelming.  At MCL Construction, our people simplify the process by listening, planning, executing, and continuing the relationship to build their vision
0 Comments



Leave a Reply.

    Author

    MCL Construction uses many voices from within and outside the company to give informed advice, opinions, and techniques about construction methods, innovation, and technology.
    ​

    Archives

    October 2024
    September 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    January 2024
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    April 2023
    March 2023
    December 2022
    October 2022
    July 2022
    September 2021
    August 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    October 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    February 2019
    January 2019
    December 2018
    November 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    September 2016
    August 2016
    July 2016
    June 2016
    April 2016

    Categories

    All
    25-years
    30 Year Anniversary
    30-Year Anniversary
    3D High Definition Laser Scanning
    Adolescent Therapy
    AJ Leonard
    Alex Tapia-Vargas
    Allied Construction Services
    Anthony's Restaurant
    API Design
    Aquatics
    Architect
    Architectural Photography INC
    Archive
    Athletics
    Austin Kay
    Autodesk
    Autodesk BIM 360
    Autodesk BIM 360 Field
    Bankers Trust
    Baseball
    Baseball Field
    Bass
    Bellevue
    Bendpack
    Best Places
    BIM
    BIM 360
    BIMForum
    Bluebeam
    Blueprint
    Bob Carlisle
    Boys Town
    Brad Anderson
    Braden Johnson
    Brant Yantzer
    Builders Blitz
    Building Green
    Building Information Modeling
    Businessman
    Career
    Career Change
    Career Fair
    Career Path
    Careers
    Carpenter
    Cars
    Catholic Church
    Center Street Medical
    Central Nebraska
    Centris
    Centris Federal Credit Union
    Charles Sachs
    Chemotherapy
    Child Saving Institute
    City Of Gretna
    Client Experience
    Clinical
    Clubhouse
    Collaborate
    Collaboration
    College
    Commercial Construction
    Commerical Real Estate Women
    Community
    Community Center
    Community Outreach
    Competition Pool
    Construction
    Construction Industry
    Construction Safety
    Construction Technology
    Contractors Commitment
    Coreslab Structures
    COVID-19
    Craftsman
    Credit Union
    Creighton Prep
    Creighton School Of Dentistry
    Creighton Unversity
    Crescent
    CREW
    CSI
    Cuming Street
    Data
    Database
    Dave Jesse
    David Olson
    Davis Erection
    Dealership
    Decisions
    Director
    Disadvantaged Businesses
    Diversity
    DLR Group
    Donation
    Don Gausden
    Drew Pflug
    Dr. Hani Haider
    Early Childhood Program
    Economic Inclusion
    Education
    EIA
    Electric Company Of Omaha
    ElectriCity
    Elementary School
    Emergency Youth Shelter
    Emerging Businesses
    Employee Education
    Employees
    EMT
    Engineering
    Engineering.Com
    Engineering Integration
    Engineering News-Record
    ENR
    ENR 400
    Entrepreneurship
    Eric Widerin
    Expanding
    Experience
    Father Flanagan
    Field
    Field Engineer
    Field Operations Developer
    Fire
    Fire Suppression
    First National Bank
    Fishing Tournament
    Fitness
    Football
    Fr. Paul Colling
    Fundraiser
    Gary Leapley
    Gary Peters
    General Contractor
    Geofoam
    Golf
    Governor
    Graduation
    Grand Island
    Greg Boulay
    Gretna
    Gretna Crossing
    Gretna Crossing Park
    Gretna High School
    Gretna Public Schools
    Grower's Award
    Growth
    Gym
    Habitat For Humanity
    Hastings
    Health
    Healthcare
    Heather Fredrick
    High Definition Scanning
    High School
    High School Sports
    Hiring
    Holland Basham Architects
    HR
    Human Resources
    Information
    Information Technology
    Inner Beauty Salon
    Innovate
    Innovation
    Intern
    Interns
    Internship
    Internships
    Investors Realty
    Iowa
    Iowa State
    IT
    Jim Meyers
    Jim Pillen
    Job
    Jobs
    Job Search
    Joe Hebenstreit
    Joe Kotulak
    JoEllen Smith
    John Sova
    Josh Dinsmore
    Josh Hannum
    J.R. Barger & Sons
    JSW Contractors
    Kansas State University
    Kearney
    Keith Basham
    Ken West
    Kiewit Construction
    Kirstal Mordhorst
    KMTV
    Kristal Cavanaugh
    Lars Renovation Services
    Laser Scanning
    Lauritzen Outpatient Center
    La Vista
    Lazy River
    Leadership
    Leadership Omaha
    Leica BLK360
    Lemars
    Lighting
    LInkedIn
    Love Church
    Low Voltage
    Lyle Ott
    Marine Crops
    Mark Berner
    Marketing
    Matterport
    Mazda
    McGill Asbestos
    MCL
    MCL Basics
    MCL Construction
    MCL Headquarters
    Medical Office Space
    Mental Health Awareness
    Mentorship
    Methodist College
    Methodist Estabrook Cancer Center
    Methodist Hospital
    Metropolitan Community College
    Meyers Carlisle
    MIchigan State University
    Middle School
    Midwest Bass Anglers Club
    Mike Heser
    Mike McGlade
    Mike Waldman
    Milt Critzer
    Minority Owned Businesses
    Modula Lift
    Nancy Benson
    Nangode LLC
    NAWIC
    Nebraska
    Nebraska Medicine
    New Employee
    Nick Brim
    Nicole Schippel
    Nikki Schippel
    Nolan Larson
    Norm Christensen
    Northstar
    Notre Dame Cathedral
    Numbers
    Occupational Therapy
    OCI
    Office Renovation
    Omaha
    Omaha Chamber
    Omaha Chamber Of Commerce
    Omaha Country Club
    Omaha Lancers
    Open Space
    Opportunity
    Pandemic
    Papillion
    Papillion South High School
    Paris
    Paula Ebert
    Paul Beller
    Pediatric Therapy
    Peitzmeier Demolition
    Peru State
    Photography
    Physical Therapy
    Pictures
    PILOT
    Pool
    Prairie Mechanical
    Preconstruction
    Price
    Prince Of Peace
    Professional
    Project Advocates
    Project Engineering
    Project Executive
    Project Manager
    Promotion
    Pro-Team Cleaning Services
    Punch List
    Quality
    Rachel Dempsey
    Rachel Robak
    Ralph Leonard
    RDG Planning And Design
    Reach
    Recruiting
    Reflections
    Relationships
    Restaurant
    Revit
    Robitics
    Safety
    Safety Games
    Safety Week
    Sales
    Savannah Cuevas
    Savannah Stark
    Scare Away Cancer
    School
    Seating
    Selection
    Sergio Mateo
    Service Center
    Silica Dust
    Slowdown
    Small And Emerging Businesses
    Small Businesses
    Smart Lab
    Soccer
    Softball
    Softball Field
    Software
    Southeast Community College
    Spencer Smith
    Stadium
    Stone Creek
    Storage
    Student
    Subcontractors
    Superintendent
    Sustainability
    Swimming
    Swimming Pool
    Sydney Nebraska
    TACK Architects
    Tanna White
    Teacher
    Team
    Technology
    T. Hansen Construction
    Thierry Willner
    Tim Malik
    Tim Tiensvold
    Tony Fucinaro
    Tool Inspection
    Track
    Track System
    Trades
    Traffic
    Training
    Travis Boatwright
    Travis Justice
    Trevor Bruegman
    Tristen Davis
    Tyler Adams
    Tyler Dunklau
    Union Pacific
    University Of Nebraska
    University Of Oregon
    UNL
    UNMC
    UNO
    U.S. CAD
    VDC
    Virtual Design And Construction
    Volunteer Firefighter
    Water Park
    Water Slide
    Wayne State College
    Welding
    Wellness
    Wellness Award
    Will Barton
    Winsley Durand
    Women In Construction Week
    Woodhouse
    Woodhouse Auto Family
    Woodshop
    WOWT
    YMCA

    RSS Feed

CAREERS

MEET THE TEAM

WHAT WE BUILD

HOW WE BUILD

NEWSROOM​​

Picture

​MCL Construction is an equal opportunity employer

​Omaha, Nebraska General Contractor | Omaha, Nebraska Construction Manager | Central Nebraska General Contractor | Kearney, Nebraska General Contractor| Grand Island, Nebraska General Contractor | Hastings, Nebraska General Contractor | Healthcare Construction | Corporate Office Construction |
Education Construction | Church Construction | School Construction | Restaurant Construction | Retail Construction | Hospital Construction | Senior Living Construction | Bank Construction | Apartment Construction | Council Bluffs, Iowa General Contractor | Iowa General Contractor​
© 2025 MCL Construction. All Rights Reserved. Terms and Conditions